1、启动前应对机器设备系统各部位认实停止查抄,确认优良前方可启动。这些问题其实并不是配件的问题,其实跟我们的操作有直接关系。
1. Before start-up, all parts of the machine, equipment and system shall be confirmed, and the inspection shall be stopped to confirm that they are excellent before start-up. In fact, these problems are not the problems of accessories, but are directly related to our operation.
2、启动前,应将搅拌操作杆放正在“空档”位置。
2. Before starting, put the mixing operating lever in the "neutral" position.
3、启动后,应将搅拌操作杆放正在“卸料”位置,放去筒内积水。
3. After startup, place the mixing operating rod at the "unloading" position to remove the accumulated water in the cylinder.
4、拆料时,搅拌操纵杆应放正在“拆料”位置。
4. During material removal, the mixing control lever shall be placed in the "material removal" position.
5、运输前,卸料槽需固定正在“行驶”位置,避免摆动。
5. Before transportation, the unloading chute shall be fixed at the "driving" position to avoid swinging.
6、操纵操作杆时,应正在“空档”位置稍做停留前方可动至下一个位置。
6. When operating the operating lever, it should be in the "neutral" position for a little pause, and the front can move to the next position.
7、搞好文明施工,桶内多余质料禁绝随意乱倒。卸料后需对搅拌筒、料槽、托辊等部位停止清洗。
7. Do a good job in civilized construction, and it is forbidden to pour the excess materials in the barrel at will. After unloading, stop cleaning the mixing drum, chute, idler and other parts.
8、人进入筒内肃清砼结块时,应将车辆熄火,拔下电门钥匙,筒外设人监护。
8. When a person enters the barrel to remove the concrete caking, the vehicle shall be turned off, the switch key shall be removed, and a person shall be arranged outside the barrel for supervision.
The automatic feeding mixer provides you with the above wonderful contents. For more wonderful contents, please click to enter our website: http://www.shanqijituan.com We will have more content for you to check later.